SubChapter E. SURFACE COAL MINES: MINIMUM ENVIRONMENTAL PROTECTION PERFORMANCE STANDARDS  


Section 87.91. Requirements
Section 87.92. Signs and markers
Section 87.93. Casing and sealing of drilled holes
Section 87.94. [Reserved]
Section 87.95. [Reserved]
Section 87.96. Topsoil: general requirements
Section 87.97. Topsoil: removal
Section 87.98. Topsoil: storage
Section 87.99. Topsoil: redistribution
Section 87.100. Topsoil: nutrients and soil amendments
Section 87.101. Hydrologic balance: general requirements
Section 87.102. Hydrologic balance: effluent standards
Section 87.103. Precipitation event exemption
Section 87.104. Stream channel diversions
Section 87.105. Hydrologic balance: diversions
Section 87.106. Hydrologic balance: sediment control measures
Section 87.107. Hydrologic balance: treatment facilities
Section 87.108. Hydrologic balance: sedimentation ponds
Section 87.109. Hydrologic balance: discharge structures
Section 87.110. Hydrologic balance: acid-forming and toxic-forming spoil
Section 87.111. Hydrologic balance: impoundments
Section 87.112. Hydrologic balance: dams, ponds, embankments and impoundments—design, construction and maintenance
Section 87.113. Hydrologic balance: coal processing waste dams and embankments
Section 87.114. [Reserved]
Section 87.115. Hydrologic balance: protection of groundwater recharge capacity
Section 87.116. Hydrologic balance: groundwater monitoring
Section 87.117. Hydrologic balance: surface water monitoring
Section 87.118. [Reserved]
Section 87.119. Hydrologic balance: water rights and replacement
Section 87.120. Hydrologic balance: discharge of water into an underground mine
Section 87.121. Hydrologic balance: permanent postmining renovation of sedimentation ponds, diversions, impoundments and treatment facilities
Section 87.122. [Reserved]
Section 87.123. Utilization and conservation of coal
Section 87.124. Use of explosives: general requirements
Section 87.125. Use of explosives: preblasting survey
Section 87.126. Use of explosives: public notice of blasting schedule
Section 87.127. Use of explosives: surface blasting requirements
Section 87.129. Use of explosives: records of blasting operations
Section 87.131. Disposal of excess spoil
Section 87.135. Protection of underground mining
Section 87.136. Disposal of noncoal wastes
Section 87.137. Air resources protection
Section 87.138. Protection of fish, wildlife and related environmental values
Section 87.139. Slides and other damages
Section 87.140. Contemporaneous reclamation
Section 87.141. Backfilling and grading: general requirements
Section 87.142. Backfilling and grading: reaffecting previously mined lands
Section 87.143. [Reserved]
Section 87.144. Backfilling and grading: final slopes
Section 87.145. Backfilling and grading: covering coal and acid-forming and toxic-forming materials
Section 87.146. Regrading or stabilizing rills and gullies
Section 87.147. Revegetation: general requirements
Section 87.148. Revegetation: timing
Section 87.149. Revegetation: introduced species
Section 87.150. Revegetation: agriculture crops
Section 87.151. Revegetation: species
Section 87.152. Revegetation: seedbed preparation
Section 87.153. Revegetation: mulching
Section 87.154. [Reserved]
Section 87.155. Revegetation: standards for successful revegetation
Section 87.156. Revegetation: techniques and frequency of measurement
Section 87.157. Cessation of operations: temporary
Section 87.158. Cessation of operations: permanent
Section 87.159. Postmining land use
Section 87.160. Haul roads and access roads
Section 87.161. [Reserved]
Section 87.162. [Reserved]
Section 87.163. [Reserved]
Section 87.164. [Reserved]
Section 87.165. [Reserved]
Section 87.166. Haul roads and access roads: restoration
Section 87.167. [Reserved]
Section 87.168. [Reserved]
Section 87.169. [Reserved]
Section 87.170. [Reserved]
Section 87.171. [Reserved]
Section 87.172. Other transportation facilities
Section 87.173. Support facilities and utility installations
Section 87.174. Steep slope operations
Section 87.175. Variance to contouring
Section 87.176. Auger mining
Section 87.177. Prime farmland: special requirements
Section 87.178. Prime farmland: soil removal
Section 87.179. Prime farmland: soil stockpiling
Section 87.180. Prime farmland: soil replacement
Section 87.181. Prime farmland: revegetation

Notation

Cross References

   This subchapter cited in 25 Pa. Code §  86.38 (relating to criteria for approval or denial: existing structures); 25 Pa. Code §  87.1 (relating to definitions); 25 Pa. Code §  87.63 (relating to existing structures); 25 Pa. Code §  87.69 (relating to protection of hydrologic balance); 25 Pa. Code §  87.201 (relating to scope); 25 Pa. Code §  87.204 (relating to application for authorization); 25 Pa. Code §  87.205 (relating to approval or denial); and 25 Pa. Code §  87.206 (relating to operational requirements).