SubChapter B. APPLICATION REQUIREMENTS  


Section 288.101. Two phase process
Section 288.111. Basic requirements
Section 288.112. Facility plan
Section 288.113. Maps and related information
Section 288.121. Description of geology, soils and hydrology; generalrequirements
Section 288.122. Geology and groundwater description
Section 288.123. Groundwater quality description
Section 288.124. Soil description
Section 288.125. Surface water information
Section 288.126. Alternative water supply information
Section 288.127. Mineral deposits information
Section 288.128. Notification of proximity to airport
Section 288.131. Basic requirements
Section 288.132. Operation plan
Section 288.133. Map and grid requirements
Section 288.134. Plan for access roads
Section 288.135. Access control plan
Section 288.136. Nuisance minimization and control plan
Section 288.137. Litter control plan
Section 288.138. Daily volume
Section 288.139. Radiation protection action plan
Section 288.141. Compaction and cover plan
Section 288.142. Revegetation plan
Section 288.151. Soil erosion and sedimentation control plan
Section 288.152. Water quality monitoring plan
Section 288.161. Gas monitoring and control plan
Section 288.171. Contingency plan
Section 288.181. Postclosure land use plan
Section 288.182. Closure plan
Section 288.191. Plan for disposal of PCBs
Section 288.192. Plan for the disposal of friable asbestos containing waste
Section 288.193. Plan for other special handling wastes

Notation

Cross References

   This subchapter cited in 25 Pa. Code §  288.411 (relating to general requirements); 25 Pa. Code §  288.415 (relating to waste classification plan); 25 Pa. Code §  288.511 (relating to general requirements); 25 Pa. Code §  288.515 (relating to waste classification plan); 25 Pa. Code §  288.611 (relating to description of soil base); and 25 Pa. Code §  288.612 (relating to waste classification plan).