Section 128b.17. Conditions requiring on-site pesticide collection  


Latest version.
  • A leaking, deteriorated or otherwise unsafe container of pesticide may not be transported by a participant to a central site for collection by a contractor, but shall be over packed and collected onsite by the contractor. Quantities of pesticide that are too large, too heavy, too unwieldy, in excess of allowable quantities for waste transport or otherwise incapable of being safely transported by a participant to a central site for collection shall be collected onsite by a contractor. If either the contractor or the participant makes the determination that a pesticide container is leaking, deteriorated or otherwise unsafe, or that a pesticide container is too large, too heavy, too unwieldy or otherwise incapable of being safety transported by a participant to a central site for collection, the pesticide container shall be over packed and collected onsite by the contractor.

The provisions of this § 128b.17 amended June 30, 2006, effective July 1, 2006, 36 Pa.B. 3231. Immediately preceding text appears at serial page (279363).

Notation

Authority

The provisions of this § 128b.17 amended under section 7(b)(2) of the Pesticide Control Act of 1973 (3 P. S. § 111.27(b)(2)).

Cross References

This section cited in 7 Pa. Code § 128b.14 (relating to bid specifications).