Section 115.312. Prior use of land  


Latest version.
  • (a) The land on which certified sod is to be established shall have been in the production of cultivated crops or clean fallow for at least one growing season preceding the seeding of the turfgrass for certification.

    (b) A field which is in sod production shall be considered for certification only if the preceding crop has been a cultivated turfgrass.

    (c) Soil fumigation or other appropriate weed control methods performed in accordance with recommended procedures may be used in preparation of a field in one growing season in place of the requirements of subsections (a) and (b).