Section 233.10. Standards, methods, techniques, designs, and special conditions  


Latest version.
  • (a) The Department reserves the right to specify or make determinations as to the standards, methods, techniques, designs and dimensional criteria acceptable in projects funded by transportation enhancement grants under this chapter.

    (b) The design and construction of an approved project are subject to the review and approval of the Department, including costs, materials, plans, specifications, and design and operational details.

    (c) Failure to meet special conditions, performance criteria or specifications may result in the withdrawal of the transportation enhancement grant, disqualification from future consideration for a transportation enhancement grant under this chapter, or declaration of a sponsor to be in default of the terms of the grant agreement.