Section 57.143. Existing and planned generating capability
-
(a) The Annual Resource Planning Report (ARPR) shall include a description of existing generating capability, the cost of which is being recovered by the EDC in a competitive transition charge, as defined under 66 Pa.C.S. § 2803 (relating to definitions), and planned generating capability installations, changes and removals.
(1) The data shall include station name and unit number, location, date installed or to be installed, unit type, primary fuel type and fuel transportation method, summer and winter net capability in megawatts, changes in capability occurring during the past year and percent ownership share.
(2) The data shall include those facilities which are owned in whole or in part by the reporting EDC. A jointly owned unit shall be designated as such and the EDCs share of the unit shall be indicated.
(3) The data shall include actual data for the past year and estimated data for the ensuing 5 years.
(b) The ARPR shall include a description of existing generating capability and planned generating capability installations, changes and removals for the EDCs control area and appropriate regional reliability council, as defined under § 57.192 (relating to definitions).
(1) The data shall include actual data for the past year and estimated data for the ensuing 5 years.
(2) The data shall include station name and unit number, location, date installed or to be installed, unit type, primary fuel type and fuel transportation method and summer and winter net capability in megawatts.
(c) The ARPR shall include a synopsis of major occurrences where electric generation suppliers were unable to supply scheduled loads within the EDCs service territory during the previous year. The synopsis shall include the electric generation suppliers name, the amount of energy and capacity involved in megawatt-hours and megawatts, respectively, the period of time involved and other pertinent information relating to the major occurrences.
The provisions of this § 57.143 amended February 25, 2000, effective February 26, 2000, 30 Pa.B. 1129. Immediately preceding text appears at serial pages (205868) to (205869).
Notation
The provisions of this § 57.143 amended under the Public Utility Code, 66 Pa.C.S. § § 501, 524, 1501, 1504 and 2809.