Section 54.34. Change in organizational structure or operational status
-
(a) The applicant is under a duty to inform the Commission of a material change in the information provided in the application during the pendency of the application, or while the licensee is operating in this Commonwealth.
(b) A material change in the organizational structure or operation that affects an applicants or a licensees operation in this Commonwealth shall be reported to the Commission within 30 days of the date of the change. Specifically, notification shall be given to the Commission of a change in the following:
(1) The ownership of generation or transmission facilities or other inputs to electric power production.
(2) An affiliation with an EDC, or an entity which owns generation or transmission facilities or other inputs to electric power production.
(3) An affiliation with an entity that has a franchised service area.
(c) Unless directed otherwise by the Commission, the licensee does not need to file an amended application with the Commission.