Pennsylvania Code (Last Updated: April 5, 2016) |
Title 34. LABOR AND INDUSTRY |
PART I. Department of Labor and Industry |
Chapter 59. D-H Hazardous Commercial, Industrial, Office |
Section 59.11. Story height
-
D-H occupancies shall be governed by the story height limitations in the following table:
Construction
TypeMaximum
Story HeightFireresistive 3 Stories Noncombustible 1 Story* Protected Heavy Timber 1 Story Ordinary 1 Story Wood Frame 1 Story (b) *An additional story shall be permitted in noncombustible construction when the building is 1-hour rated construction or totally protected by an automatic sprinkler system. The maximum story height may be increased by one story.
(c) Noncombustible construction shall be considered 1-hour rated construction when bearing walls, columns, beams, other supporting members, ceiling/roof assemblies, floor/ceiling assemblies, stairways, and other openings through floors are of 1-hour rated construction.
(d) The maximum floor area shall not exceed 50,000 square feet unless the floor area is separated by 2-hour fire walls into individual areas not to exceed 50,000 square feet. The undivided floor area may be increased to 100,000 square feet in buildings protected with a total automatic sprinkler system.