Section 283.214. Measurement and inspection of waste  


Latest version.
  • (a) An operator of a municipal waste processing facility that has received, is receiving or will receive 30,000 or more cubic yards of solid waste in a calendar year shall weigh solid waste when it is received. The scale used to weigh solid waste shall conform to 3 Pa.C.S. Chapter 41 (relating to the Consolidated Weights and Measures Act) and 70 Pa. Code Part I (relating to weighmasters). The operator of the scale shall be a licensed public weighmaster under 3 Pa.C.S. Chapter 41 and 70 Pa. Code Part I.

    (b) The operator of a facility that is not required by subsection (a) to weigh waste when it is received, shall accurately measure waste by volume or weight prior to unloading.

    (c) The operator of a facility shall inspect and monitor incoming waste to insure that the receipt of waste is consistent with this article.

The provisions of this § 283.214 amended December 22, 2000, effective December 23, 2000, 30 Pa.B. 6685. Immediately preceding text appears at serial page (226387).

Notation

Cross References

This section cited in 25 Pa. Code § 283.102 (relating to operating plan).