Pennsylvania Code (Last Updated: April 5, 2016) |
Title 25. ENVIRONMENTAL PROTECTION |
PART I. Department of Environmental Protection |
Subpart D. Environmental Health and Safety |
Article VIII. Municipal Waste |
Chapter 277. Construction/Demolition Waste Landfills |
SubChapter C. OPERATING REQUIREMENTS |
Section 277.284. Sampling and analysis
-
A person or municipality operating a construction/demolition waste landfill shall conduct sampling and analysis from each monitoring point for the following parameters at the following frequencies:
(1) Quarterly, for chloride, sulfate, chemical oxygen demand, pH, specific conductance, total organic carbon, total organic halogen, iron and sodium, and, if required by the Department, for other constituents found in the waste received at the facility.
(2) Quarterly, for groundwater elevations in monitoring wells recorded as a distance from the elevation at the well head referenced to mean sea level based on United States Geological Survey datum.
The provisions of this § 277.284 amended December 22, 2000, effective December 23, 2000, 30 Pa.B. 6685. Immediately preceding text appears at serial page (226317).
Notation
This section cited in 25 Pa. Code § 271.113 (relating to closure plan); 25 Pa. Code § 277.152 (relating to water quality monitoring plan); 25 Pa. Code § 277.254 (relating to leachate detection zone); 25 Pa. Code § 277.281 (relating to general requirements); and 25 Pa. Code § 277.322 (relating to closure).