Pennsylvania Code (Last Updated: April 5, 2016) |
Title 25. ENVIRONMENTAL PROTECTION |
PART I. Department of Environmental Protection |
Subpart D. Environmental Health and Safety |
Article VIII. Municipal Waste |
Chapter 277. Construction/Demolition Waste Landfills |
SubChapter C. OPERATING REQUIREMENTS |
Section 277.221. Daily volume
Latest version.
-
(a) A person or municipality operating a construction/demolition waste landfill may not receive solid waste at the landfill in excess of the maximum or average daily volume approved in the permit.
(b) The average daily volume is a limit on the volume of solid waste that is permitted to be received at the facility, and shall be computed quarterly by averaging the total volume received over the quarter.
The provisions of this § 277.221 adopted December 22, 2000, effective December 23, 2000, 30 Pa.B. 6685.