Pennsylvania Code (Last Updated: April 5, 2016) |
Title 25. ENVIRONMENTAL PROTECTION |
PART I. Department of Environmental Protection |
Subpart D. Environmental Health and Safety |
Article VIII. Municipal Waste |
Chapter 277. Construction/Demolition Waste Landfills |
SubChapter C. OPERATING REQUIREMENTS |
Section 277.219. Recycling
-
(a) The operator shall salvage and recycle waste materials received at the facility for which recycling is cost effective, in accordance with the plan approved under § 277.138 (relating to recycling plan).
(b) Salvaging and recycling of materials may not be allowed or conducted unless salvaging and recycling is controlled by the operator to prevent interference with prompt and sanitary operations and is conducted to prevent a health hazard or nuisance.
(c) Salvaged material shall be promptly moved from the unloading area and either stored in an approved area under Chapter 285 (relating to storage, collection and transportation of municipal waste) or transported offsite.
The provisions of this § 277.219 adopted April 8, 1988, effective April 9, 1988, 18 Pa.B. 1681; amended October 9, 1992, effective October 10, 1992, 22 Pa.B. 5105. Immediately preceding text appears at serial page (126314).
Notation
This section cited in 25 Pa. Code § 277.138 (relating to recycling plan).