![]() |
Pennsylvania Code (Last Updated: April 5, 2016) |
![]() |
Title 25. ENVIRONMENTAL PROTECTION |
![]() |
PART I. Department of Environmental Protection |
![]() |
Subpart D. Environmental Health and Safety |
![]() |
Article VIII. Municipal Waste |
![]() |
Chapter 277. Construction/Demolition Waste Landfills |
![]() |
SubChapter B. APPLICATION REQUIREMENTS |
Section 277.171. Gas monitoring and recovery plan
-
When the decomposition of the construction/demolition waste that is proposed to be disposed at the facility may generate gas, the application shall include a plan sufficient to detect and control gas emanating from the facility. The plan shall include the following:
(1) A plan to monitor and record gas on and off the site, including structures, offsite gas migration and gas accumulation.
(2) Designs for a gas control system, indicating the location and scheduling of construction, and the design of vents, barriers, collection pipes, manifolds or other control measures that will be put in place.
Notation
This section cited in 25 Pa. Code § 277.131 (relating to basic requirements); and 25 Pa. Code § 277.292 (relating to gas control and monitoring).