SubChapter B. APPLICATION REQUIREMENTS  


Section 273.101. Two phase process
Section 273.111. General
Section 273.112. Facility plan
Section 273.113. Maps and related information
Section 273.114. Description of geology, soils and hydrology—general requirements
Section 273.115. Geology and groundwater description
Section 273.116. Groundwater quality description
Section 273.117. Soil description
Section 273.118. Surface water information
Section 273.119. Alternative water supply information
Section 273.120. Mineral deposits information
Section 273.121. Notification of proximity to airport
Section 273.131. Basic requirements
Section 273.132. Operation plan
Section 273.133. Map and grid requirements
Section 273.134. Plan for access roads
Section 273.135. Access control plan
Section 273.136. Nuisance minimization and control plan
Section 273.137. Litter control plan
Section 273.138. Plan for protection of capacity
Section 273.139. Relationship to county plans
Section 273.140. Daily volume
Section 273.140a. Radiation protection action plan
Section 273.141. Compaction and cover plan
Section 273.142. Revegetation plan
Section 273.151. Soil erosion and sedimentation control plan
Section 273.152. Water quality monitoring plan
Section 273.161. Liner system and leachate control plan
Section 273.162. Leachate treatment plan
Section 273.163. Modifications of leachate treatment plan
Section 273.171. Gas monitoring and control plan
Section 273.181. Contingency plan
Section 273.191. Postclosure land use plan
Section 273.192. Closure plan
Section 273.196. Recycling plan
Section 273.197. Plan for recycled materials collection center

Notation

Cross References

   This subchapter cited in 25 Pa. Code §  273.401 (relating to scope).