Section 297.214. Measuring and inspection of waste  


Latest version.
  • (a) An operator of a solid waste processing facility that has received, is receiving or will receive 30,000 or more cubic yards of residual waste in a calendar year shall weigh residual waste when it is received. The scale used to weigh residual waste shall conform to 3 Pa.C.S. Chapter 41 (relating to the Consolidated Weights and Measures Act) and 70 Pa. Code Part I (relating to weighmasters). The operator of the scale shall be a licensed public weighmaster under 3 Pa.C.S. Chapter 41 and 70 Pa. Code Part I.

    (b) The operator of a facility that is not required by subsection (a) to weigh waste when it is received shall accurately measure waste by volume or weight prior to unloading.

    (c) The operator of a facility shall inspect and monitor incoming waste to ensure that the receipt of waste is consistent with this article.

The provisions of this § 297.214 amended January 12, 2001, effective January 13, 2001, 31 Pa.B. 235. Immediately preceding text appears at serial page (226881).