Section 293.232. Soil erosion and sedimentation control  


Latest version.
  • The operator shall manage surface water and control erosion and sedimentation to:

    (1) Divert surface water away from the storage area with measures and structures necessary to handle surface water flows based on a 25-year, 24-hour precipitation event, and supported by written calculations and also comply with Chapter 102 (relating to erosion control).

    (2) Meet the requirements of Chapters 102 and 105 (relating to erosion and sediment control; and dam safety and waterway management).

    (3) Prevent erosion to the maximum extent possible, including where possible, using revegetation.

The provisions of this § 293.232 amended January 12, 2001, effective January 13, 2001, 31 Pa.B. 235. Immediately preceding text appears at serial page (266344).

Notation

Cross References

This section cited in 25 Pa. Code § 293.105 (relating to soil plan).