Section 109.501. General permit requirements  


Latest version.
  • (a) A person may not construct a public water system without first having obtained a construction permit from the Department under § 109.503 (relating to public water system construction permits) except as provided in § § 109.502 and 109.505 (relating to permitting of currently operating systems; compliance deadlines; and requirements for noncommunity water systems).

    (b) A person may not substantially modify a permitted public water system without first obtaining an amended construction permit from the Department under § 109.503(b).

    (c) A person may not operate a public water system without first having obtained an operation permit from the Department under § 109.504 (relating to public water system operation permits) except as provided in § § 109.502 and 109.505.

    (d) A person may not operate a substantially modified facility without first obtaining an amended operation permit from the Department under § 109.504.

The provisions of this § 109.501 adopted December 7, 1984, effective December 8, 1984, 14 Pa.B. 4479; amended May 15, 1992, effective May 16, 1992, 22 Pa.B. 2621. Immediately preceding text appears at serial page (136307).