Section 105.314. Pipelines along streams  


Latest version.
  • Pipelines along streams shall be located a sufficient distance away from the bank to prevent damage to the bank as a result of erosion; pipelines shall be located a minimum of 25 feet away from the streambank unless other erosion protection measures are approved by the Department.

The provisions of this § 105.314 adopted September 26, 1980, effective September 27, 1980, 10 Pa.B. 3843.