Section 105.46. Implementation of erosion and sedimentation control plans  


Latest version.
  • (a) During the construction of a dam, water obstruction or encroachment, the permittee shall follow the erosion and sediment control plan prepared in accordance with Chapter 102 (relating to erosion and sediment control) and submitted as part of the application.

    (b) Construction must be done in a manner to minimize erosion of banks and bed of the stream and disturbance of the regimen of the stream.

The provisions of this § 105.46 adopted September 26, 1980, effective September 27, 1980, 10 Pa.B. 3843; amended January 7, 2011, effective January 8, 2011, 41 Pa.B. 219. Immediately preceding text appears at serial page (313668).

Notation

Authority

The provisions of this § 105.46 amended under section 5 of the Dam Safety and Encroachments Act (32 P. S. § 693.5).