Section 88.293. Hydrologic balance: precipitation event exemption  


Latest version.
  • (a) To establish the alternative effluent limitations of Group B or C in § 88.292(a) (relating to hydrologic balance: effluent standards), a permittee shall demonstrate to the Department’s satisfaction that a precipitation event has occurred under this section.

    (1) The occurrence of a precipitation event greater than a 10-year, 24-hour precipitation event may be demonstrated by meeting the requirements of subsections (b)—(d) for each discharge that exceeds the effluent limits specified in § 88.292, unless the permit specifies a more stringent water quality based effluent limitation, in which case no exemption will be available under this section. If the permittee demonstrates to the Department’s satisfaction that a greater than 10-year, 24-hour precipitation event has occurred, the permittee shall meet the effluent limitation of Group C in § 88.292(a).

    (2) The occurrence of a precipitation event equal to or less than a 10-year, 24-hour precipitation event may be demonstrated by meeting the requirements of subsections (c) and (d) for each discharge that exceeds the effluent limits specified in § 88.292, unless the permit specifies a more stringent water quality based effluent limitation, in which case no exemption will be available under this section. If the permittee demonstrates to the Department’s satisfaction that a precipitation event equal to or less than a 10-year, 24-hour precipitation event has occurred, the permittee shall meet the effluent limitations of Group B in § 88.292(a).

    (b) The 1-year and 10-year; 24-hour precipitation events for specific areas in this Commonwealth are listed as follows:

    Rainfall (inches)
    County 1-Year
    10 Year
    Bradford2.3
    4.2
    Carbon2.5
    4.8
    Columbia2.4
    4.6
    Dauphin2.5
    4.8
    Lackawanna2.4
    4.7
    Lebanon2.5
    4.8
    Luzerne2.4
    4.7
    Northumberland2.4
    4.6
    Schuylkill2.5
    4.7

    (c) For the permittee to demonstrate that the event listed in subsection (b) has for his mine area been exceeded, or that dry weather flow conditions did not exist, the permittee shall comply with one of the following:

    (1) Collect 24-hour rainfall information from official United States Weather Bureau Stations within a 25-mile distance—radius—of the site.

    (2) Calculate the estimated rainfall event for the site, by appropriate interpolation of the data collected under paragraph (1). Appropriate interpolation shall be accomplished by the following:

    (i) Preparing a verified copy of the chart or readout from a Department approved flow measuring device which continuously records the influent to the permitted treatment facility. The device shall be approved by the Department in writing prior to the rainfall event for which the exemption is sought and shall be secured to prevent tampering and acts of third parties.

    (ii) Preparing an analysis identifying the runoff area tributary to the treatment facility, and compare the actual runoff as measured and depicted by the flow measuring device with the runoff expected from the 1-year or 10-year, 24-hour rainfall event specified for the mine area in subsection (b).

    (3) Develop alternative documentation or data concerning the rainfall event. The method or system for developing the documentation or data shall be approved in writing prior to the occurrence of the rainfall event for which the exemption is being sought, and shall guarantee the integrity of the information collected.

    (4) Prepare an analysis identifying the runoff area tributary to the treatment facility, and compare the actual runoff as measured and depicted by the flow measuring device with the runoff expected from the 1-year or 10-year, 24-hour rainfall event specified for the mine area in subsection (b).

    (5) Develop alternative documentation or data concerning the rainfall event. The method or system for developing the documentation or data shall be approved in writing prior to the occurrence of the rainfall event for which the exemption is being sought, and shall guarantee the integrity of the information collected.

    (d) When the discharge from the site exceeds any effluent limit in the permit, the permittee shall notify the Department, within 5 days of the occurrence of the event, that he is applying for an exemption from that limit and shall within 30 days thereafter provide the following to the Department:

    (1) The data required by subsection (c).

    (2) A showing that the facility from which the discharge occurred was designed, maintained and operated during and prior to the event to accommodate or treat a 10-year, 24-hour rainfall.

    (e) The permittee is not entitled to claim a greater than 1-year or 10-year, 24-hour precipitation event storm exemption unless the permittee has complied with subsections (c) and (d).

    (f) Nothing in this section authorizes the Department to grant an exemption for a discharge which the Department finds may have caused or contributed to a violation of general or specific water quality criteria in Chapter 93 (relating to water quality standards).

The provisions of this § 88.293 adopted December 19, 1980, 10 Pa.B. 4789, effective July 31, 1982, 12 Pa.B. 2382; amended March 30, 1984, 14 Pa.B. 1143, effective August 10, 1985, 15 Pa.B. 2872; amended June 15, 1990, 20 Pa.B. 3383, effective July 27, 1991, 21 Pa.B. 3316. Immediately preceding text appears at serial pages (148839) to (148841).

Notation

Cross References

This section cited in 25 Pa. Code § 88.292 (relating to hydrologic balance: effluent standards).