Pennsylvania Code (Last Updated: April 5, 2016) |
Title 25. ENVIRONMENTAL PROTECTION |
PART I. Department of Environmental Protection |
Subpart C. Protection of Natural Resources |
Article III. Air Resources |
Chapter 127. Construction, Modification, Reactivation and Operation of Sources |
SubChapter E. NEW SOURCE REVIEW |
Section 127.205. Special permit requirements
-
The Department will not issue a plan approval, or an operating permit, or allow continued operations under an existing permit or plan approval unless the applicant demonstrates that the following special requirements are met:
(1) A new or modified facility subject to this subchapter shall comply with LAER, except as provided in § 127.203a(a)(2) (relating to applicability determination). When a facility is composed of several sources, only sources which are new or which are modified shall be required to implement LAER. In addition, LAER applies to the proposed modification which results in an increase in emissions and to subsequent or previous modifications which result in emissions increases that are directly related to and normally included in the project associated with the proposed modification and which occurred within the contemporaneous period of the proposed emissions increase.
(i) A project that does not commence construction within 18 months of the date specified in the plan approval shall be reevaluated for its compliance with LAER before the start of construction.
(ii) A project that discontinues construction for 18 months or more after construction is commenced shall be reevaluated for its compliance with LAER before resuming construction.
(iii) A project that does not complete construction within the time period specified in the plan approval shall be reevaluated for its compliance with LAER.
(iv) A project that is constructed in phases shall be reevaluated for its compliance with LAER if there is a delay of greater than 18 months beyond the projected and approved commencement date for each independent phase.
(2) Each facility located within this Commonwealth which meets the requirements of and is subject to this subchapter, which is owned or operated by the applicant, or by an entity controlling, controlled by or under common control with the applicant, and which is subject to emissions limitations shall be in compliance, or on a schedule for compliance approved by the Department in a plan approval or permit, with the applicable emissions limitation and standards contained in this article. A responsible official of the applicant shall certify as to the facilities compliance in writing on a form provided by the Department.
(3) Each modification to a facility which meets the requirements of and is subject to this subchapter shall offset, in accordance with § § 127.203, 127.203a and 127.210 (relating to facilities subject to special permit requirements; applicability determination; and offset ratios), the total of the net increase. Emissions offsets shall be required for the entire net emissions increase which occurred over the contemporaneous period except to the extent that emissions offsets or other reductions were previously applied against emissions increases in an earlier applicability determination.
(4) Each new facility which meets the requirements of and is subject to this subchapter shall offset the potential to emit of that facility with ERCs in accordance with § 127.210.
(5) For a new or modified facility which meets the requirements of and is subject to this subchapter, an analysis shall be conducted of alternative sites, sizes, production processes and environmental control techniques for the proposed facility, which demonstrates that the benefits of the proposed facility significantly outweigh the environmental and social costs imposed within this Commonwealth as a result of its location, construction or modification.
(6) In the case of a new or modified facility which is located in a nonattainment area, and within a zone, identified by the EPA Administrator, in consultation with the Secretary of Housing and Urban Development, as a zone to which economic development should be targeted, emissions of a pollutant resulting from the proposed new or modified facility may not cause or contribute to emission levels which exceed the allowance permitted for the pollutant for the area from new or modified facilities in the SIP.
(7) The Department may determine that the BAT requirements of this chapter are equivalent to BACT or LAER.
The provisions of this § 127.205 amended May 18, 2007, effective May 19, 2007, 37 Pa.B. 2365. Immediately preceding text appears at serial pages (313712) and (221975).
Notation
This section cited in 25 Pa. Code § 127.201 (relating to general requirements); 25 Pa. Code § 127.203 (relating to facilities subject to special permit requirements); 25 Pa. Code § 127.203a (relating to applicability determination); 25 Pa. Code § 127.204 (relating to emissions subject to this subchapter); 25 Pa. Code § 127.206 (relating to ERC general requirements); 25 Pa. Code § 127.211 (relating to applicability determination); and 25 Pa. Code § 127.213 (relating to construction and demolition).