Electric Utilities [40 Pa.B. 1281]
[Saturday, March 6, 2010]A-2010-2153807. PPL Electric Utilities Corporation. Petition of PPL Electric Utilities Corporation for a finding that a building to shelter control equipment at the Beltzville 69-12 kV substation to be constructed in Towamensing Township, Carbon County, PA, is reasonably necessary for the convenience or welfare of the public
Formal protests and petitions to intervene must be filed in accordance with 52 Pa. Code (relating to public utilities). Filings must be made with the Secretary of the Pennsylvania Public Utility Commission, P. O. Box 3265, Harrisburg, PA 17105-3265, with a copy served on the applicant, on or before March 22, 2010. The documents filed in support of the application are available for inspection and copying at the Office of the Secretary between 8 a.m. and 4:30 p.m., Monday through Friday, and at the applicant's business address.
Applicant: PPL Electric Utilities Corporation
Through and By Counsel: Paul E. Russell, Associate General Counsel, PPL Services Corporation, Two North Ninth Street, Allentown, PA 18106
John H. Isom, Esquire, Christopher T. Wright, Esquire, Post & Schell, PC, 17 North Second Street, 12th Floor, Harrisburg, PA 17101-1601
JAMES J. McNULTY,
Secretary[Pa.B. Doc. No. 10-421. Filed for public inspection March 5, 2010, 9:00 a.m.]