Consultant Selection Procedure for Engineering and Related Services [29 Pa.B. 1130] On January 27, 1999 the Department of Transportation issued Strike-off Letter 433-99-04 regarding revised Consultant Selection Procedures that require an Annual Qualification Package be submitted by all Consultants, both prime consultants and subconsultants, who desire to provide engineering and related services to the Department.
The revised procedure is as follows:
Introduction
As a result of our re-engineering efforts and partnering with the consultant community the Department has streamlined procedures for solicitation and submission of the consultants Letters of Interest as follows:
1. The Department will publish a quarterly or semi-annual listing of Open-End Contracts or projects on which we anticipate using consultant services for project development. The listing will include the County, S.R., Section, Local Name (if appropriate), Estimated Construction Cost, and the type of consultant services required; i.e. preliminary engineering, environmental studies, final design, etc.
A. The semi-annual listing for the first six (6) months of 1999 was published in the Pennsylvania Bulletin on February 6, 1999. This listing is also included in this issue of the Pennsylvania Bulletin.
2. All consultants, both prime consultants and subconsultants, must submit an Annual Qualification Package to each District in which the consultant desires to obtain consideration for an assignment. If the consultant desires to be considered for a Central Office project a Qualification Package must be sent to the Bureau of Design.
The Department will acknowledge receipt of the Annual Qualification Package if the Consultant includes the language indicated below under Section 4.E under the Annual Qualification Package.
3. The Department will advertise individually for Letters of Interest for projects contained in the published listing indicated above under Section 1.
4. For specific projects or Open-End Contracts included in the published listing mention above, Prime Consultants must respond to an advertisement for consultant services with a ''Letter of Interest'' within six (6) calendar days if they desire to be considered for assignment of the advertised project.
For specific projects or Open-End Contracts not included in the published listing the Consultant must respond within twenty (20) calendar days.
The response period will be indicated in the individual advertisements.
5. This streamlined procedure will be used for both design services and construction engineering services.
6. The Department will consider the information contained in the Annual Qualification Package and the Letter of Interest to shortlist firms for further consideration (normal selection procedures) or for direct selection of a firm for project assignment: (modified selection procedures)
Annual Qualification Package
The Annual Qualification Package is the formal expression to the Department by a consulting firm that the firm desires to be considered for various types of projects within the Central Office or an Engineering District.
The requirements of the Annual Qualification Package are as follows:
1. The Annual Qualifications Package must be submitted to each District in which a consulting firm desires to obtain consideration for an assignment. If the Consultant desires to be considered for a Central Office project a Qualification Package must be sent to the Bureau of Design. Both the prime and all subconsultants desiring to do business with the Department must submit an Annual Qualifications Package.
The Annual Qualification Package for each Consultant must include information for both design services and construction engineering if the Consultant desires to be considered for both design services and construction engineering services.
2. The Annual Qualifications Package can be submitted at any time but it must be received by the appropriate Department Organization prior to the advertised project deadline if the firm(s) desires to be considered for a project assignment.
3. The Annual Qualifications Package must be submitted at least annually, but may be updated by the consulting firm when conditions warrant.
4. The Annual Qualifications Package shall include the following items:
A. Standard Form (SF) 254--Architect-Engineer and Related Services Questionnaire in its entirety.
B. The resumes of key personnel in the firm. The resume will be limited to one (1) 8 1/2" x 11" page, one (1) side, per person.
C. Copy of the firm's registration to do business in the Commonwealth as provided by the Department of State for firms with out-of-state headquarters or corporations not incorporated in Pennsylvania.
D. A copy of the Department's DBE/WBE Certification, if applicable.
E. Transmittal Letter--Maximum of one (1) 8 1/2" x 11" page, one side.
The transmittal letter for the Annual Qualification Package should include a FAX number and the following language at the bottom of the page if the Consultant wants the Department to acknowledge receipt of the Annual Qualification Package: ''The Department acknowledges receipt of your Annual Qualification Package on ______at ______AM/PM prevailing time.''
NAME _________________
ORGANIZATION _________________
F. Failure to submit the Annual Qualification Package or failure to include the requested information in the Annual Qualification Package will eliminate the Consultant from further consideration.
Project Advertisement
1. The advertisement shall indicate if the project is non-complex, moderately complex, or complex and stipulate the limit on the number of pages allowed for the Letter of Interest.
2. For those projects where the Department desires to obtain the services of an engineering firm, the project advertisement shall contain the statement: ''By submitting a Letter of Interest for the project, the consulting firm is certifying that the firm is qualified to perform engineering services in accordance with the laws of the Commonwealth of Pennsylvania.''
3. The advertisement will indicate the DBE/WBE participation goal, if applicable. Most advertisements, with the exception of Open-End Contracts and Bridge Inspection Agreements, will include some DBE/WBE participation goal.
4. The advertisement will indicate the selection criteria to be used for the project.
5. The advertisement will indicate who the Letter of Interest should be sent to and the appropriate address.
Letter of Interest
The Letter of Interest is the formal expression to the Department by a consulting firm that the firm desires to be considered for a specific project. A project specific Letter of Interest must be received by the Central Office or the appropriate Engineering District by 4:30 p.m. prevailing time on/or before date specified in the official project announcement (currently the publication in the Pennsylvania Bulletin).
The requirements for the Letters of Interest are as follows:
1. There shall be a limit to the number of pages in the Letter of Interest as follows:
a. For non-complex projects and for most moderately complex projects--three (3) pages, 8 1/2 x 11, one sided, plus an organizational chart and additional resumes.
b. For complex projects and some moderately complex projects--five (5) pages, 8 1/2 x 11, one sided, plus an organizational chart and additional resumes.
Failure to adhere to the page limitation indicated above shall eliminate the firm who submitted the Letter of Interest from further consideration for that assignment.
2. Include the project reference number, the firm's legal name, and the firm's federal identification number.
3. Identify project manager.
4. Identify subconsultants, if any, including DBE/WBE, if required.
5. Identify key project staff.
6. Include project organizational chart (one page, one side, maximum size 11" x 17"), showing key staff from the prime and each subconsultant and their area of responsibility.
7. Provide additional resumes only of key personnel not included in the Annual Qualifications Package on file.
The Annual Qualification Package should be sent to the appropriate District or Central Office using the following addresses:
Mr. John L. Baker, P.E., District Engineer
Engineering District 1-0
140 Liberty Street
Franklin, PA 16323Mr. George M. Khoury, P.E., District Engineer
Engineering District 2-0
1924-30 Daisy Street
Clearfield, PA 16830Mr. Paul E. Heise, P.E., District Engineer
Engineering District 3-0
715 Jordan Avenue
Montoursville, PA 17754Mr. Charles M. Mattei, P.E., District Engineer
Engineering District 4-0
P. O. Box 111
Scranton, PA 18501Mr. Walter E. Bortree, P.E., District Engineer
Engineering District 5-0
1713 Lehigh Street
Allentown, PA 18103Mr. Andrew L. Warren, District Administrator
Engineering District 6-0
200 Radnor-Chester Road
St. Davids, PA 19087Mr. Barry G. Hoffman, P.E. District Engineer
Engineering District 8-0
2140 Herr Street
Harrisburg, PA 17103Mr. Earl L. Neiderhiser, P.E., District Engineer
Engineering District 9-0
1620 North Juniata Street
Hollidaysburg, PA 16648Mr. Richard H. Hogg, P.E., District Engineer
Engineering District 10-0
Rt. 286 South, P. O. Box 429
Indiana, PA 15701Mr. Raymond Hack, P.E., District Engineer
Engineering District 11-0
45 Thoms Run Road
Bridgeville, PA 15017Mr. Michael H. Dufalla, P.E., District Engineer
Engineering District 12-0
P. O. Box 459, N. Gallatin Avenue Ext.
Uniontown, PA 15401M. G. Patel, P.E.
Director, Bureau of Design
Pennsylvania Department of Transportation
7th Floor, Forum Place
555 Walnut Street
P. O. Box 3060
Harrisburg, PA 17105-3060Anticipated Consultants Solicitations During the first six (6) months of 1999 the Department of Transportation anticipates soliciting Letters of Interest from Consultant firms interested in providing work and services for the following specific project agreements or open-end contracts:
Engineering District 1-0
1. S.R. 0079, Section A05
Crawford County
Construction Inspection2. S.R. 3008, Section B00
Venango County
Construction Inspection3. S.R. 0080, Section A01
Venango County
Construction Inspection4. Open-End Contract
Construction Inspection5. S.R. 4034, Section A60
Erie County
Final Design and Construction
Consultation6. S.R. 4034, Section A70
Erie County
Final Design and Construction
Consultation7. S.R. 3006, Section B03
Erie County
Preliminary Engineering, Final Design
and Construction Consultation8. S.R. 0090, Section B00
Erie County
Preliminary Engineering, Final Design
and Construction Consultation9. Powell Avenue
Erie County
Preliminary Engineering and
Environmental Assessment10. South Hills Road
Erie County
Preliminary Engineering and
Environmental AssessmentEngineering District 2-0
1. S.R. 0322, Section C08
Centre County
Final Design
Centre Street Extension2. S.R. 0322, Section C09
Centre County
Final Design
Ninth Street Connector3. S.R. 0322, Section A03
Centre County
Final Design
Bridge Replacement over
Moshannon CreekEngineering District 3-0
1. Open-End Contract
Environmental Studies2. S.R. 1022, Section 003
Bradford County
Design and Environmental Studies
Ulster Bridge over the
Susquehanna River3. S.R. 0054, Section 037
Northumberland County
Final Design
Climbing lane from Danville to Elysburg4. Open-End Contract
Engineering Services5. S.R. 2024, Section 001
Bradford County
Airport Road Bridge, PMS #039C0716. Lycoming County
Airport Access Road7. Lycoming County
Lycoming Mall Interchange8. S.R. 0522, Section 043
Snyder County
Preliminary Engineering and Final Design
Bridge Replacement9. S.R. 35021
Snyder County
Preliminary Engineering and Final Design
Bridge Replacement10. S.R. 405063
Lycoming County
Preliminary Engineering and Final Design
Bridge ReplacementEngineering District 4-0
1. S.R. 2005, Section 371
Luzerne County
Carey Avenue Bridge
Conceptual Design for Modified Turnkey2. S.R. 029, Section 770
Wyoming County
Bridge Replacement
Preliminary Engineering and Final Design3. S.R. 2001, Sections 401 and 402
Pike County
Highway Rehabilitation
Preliminary Engineering and Final Design4. Four (4) Open-End Contracts
Engineering and Environmental ServicesEngineering District 5-0
1. S.R. 4028, Section 01B
Berks County
Preliminary Engineering and Final Design
State Street Bridge2. S.R. 0061
Berks County
Corridor feasibility study for S.R. 613. S.R. 0061
Berks County
Preliminary Engineering and Final Design
Safety upgrade of S.R. 614. S.R. 4025
Lehigh County
Preliminary Engineering and Final Design
Frantz Bridge5. S.R. 0080
Monroe County
Preliminary Engineering and Final Design
I-80 Bridges6. S.R. 0080
Monroe County
Study
I-80 Welcome Center7. S.R. 1018, Section 02B
Northampton County
Preliminary Engineering and Final Design
Mesinger Street BridgeEngineering District 8-0
1. S.R. 0394
Adams County
Preliminary Engineering and Final Design
Shrivers Corner Bridge2. S.R. 2013, Section B04
Adams County
Preliminary Engineering and Final Design
Alloway Creek Bridge3. S.R. 1022
Lebanon County
Preliminary Engineering and Final Design
S.R. 1022/Swatara Creek4. S.R. 2017
Dauphin County
Manada Bottom Bridge 25. S.R. 0422
Dauphin County
Preliminary Engineering and Final Design
Derry Township Signals6. S.R. 0081, Section 023
Lebanon County
Preliminary Engineering and Final Design
ReconstructionEngineering District 9-0
1. S.R. 2007, Section OLD
Blair County
Oldtown Run Bridge
Preliminary Engineering, Final Design
and Construction Services2. S.R. 0056, Section PH1
Bedford County
PA 56 Improvements
Final Design for Inspection Improvements3. S.R. 0026, Section SOU
Huntingdon County
Raystown Access Improvements
Preliminary and Final Design for
Inspection Improvements4. S.R. 0219, Section 022
Somerset County
South Somerset Resurfacing
Preliminary Analysis and Final Design5. I-70
Fulton County
Resurfacing
Preliminary Engineering, Final Design
and Construction Services6. S.R. 1030, Sec. CYB
Bedford County
Cyphor Bridge
Preliminary Engineering, Environmental Studies, Final Design and Construction Services7. S.R. 1023, Section CCB
Cambria County
Clearfield Creek Bridge
Preliminary Engineering, Final Design and
Construction Services8. S.R. 0453, Section WID
Huntingdon County
PA 453 Widening
Preliminary Engineering, Final Design and
Construction Services9. S.R. 0056
Cambria County
West-End Bypass of Johnstown
Preliminary Engineering and Environmental
Studies10. S. R. 0030, Section 007
Bedford County
Bedford to Everett 5 lane widening
Final Design and Construction Services11. S.R. 0026
Huntingdon County
Huntingdon to Centre Co. Improvements
Preliminary Engineering and Environmental
Studies12. S.R. 0219
Somerset County
Meyersdale to Maryland
Preliminary Engineering and Environmental
Studies13. S.R. 0219
Cambria County
Carrolltown to Clearfield Co.
Preliminary Engineering and Environmental
Studies14. Open-End Contract
Construction Inspection15. Open-End Contract
Environmental/Engineering16. Open-End Contract
Right of Way and/or Utility ServicesEngineering District 10-0
1. Open-End Contract
Engineering--Environmental Services2. Open-End Contract
Right-of-Way and Utilities Services3. Open-End
Design Management4. Open-End
Construction Management5. S.R. 0022, Section 491
Indiana County
Final Design
Penn ViewEngineering District 11-0
1. S.R. 0079, Section 35M
Allegheny County
Preliminary Engineering and Final Design
S.R. 51 to I-2792. S.R. 0224, Section L02
Lawrence County
Preliminary Engineering and Final Design
State Street Bridge3. S.R. 0048
Allegheny County
Preliminary Engineering and Final Design
Mosside Boulevard Bridge4. S.R. 0088, Section 40M
Allegheny County
Construction Inspection5. S.R. 0088, Section 042
Allegheny County
Construction Inspection6. S.R. 0068, Section B03
Beaver County
Construction Inspection7. S.R. 2057, Section A02
Allegheny County
Construction Inspection8. S.R. 0028, Section 036
Allegheny County
Construction Inspection9. S.R. 1001, Section A13
Allegheny County
Construction Inspection10. S.R. 0030, Section B05
Beaver County
Construction Inspection11. S.R. 0048, Section A10
Allegheny County
Construction Inspection12. S.R. 0065, Section B08
Beaver County
Construction Inspection13. S.R. 3160, Section A03
Allegheny County
Construction InspectionThis advance notification is being provided by the Department of Transportation to allow the Consultants to begin building their team prior to the actual advertisement in the Pennsylvania Bulletin. The response time to submit a letter of interest on the above projects/open-end contracts will be six (6) calendar days.
Letters of Interest are not requested at this time. Specific advertisements will appear in future issues of the Pennsylvania Bulletin.
BRADLEY L. MALLORY,
Secretary[Pa.B. Doc. No. 99-325. Filed for public inspection February 26, 1999, 9:00 a.m.]